{"id":1855,"date":"2023-07-25T23:54:39","date_gmt":"2023-07-25T23:54:39","guid":{"rendered":"https:\/\/wgiem.com.ar\/la-serenisima-s\/"},"modified":"2023-08-02T22:57:13","modified_gmt":"2023-08-02T22:57:13","slug":"la-serenisima-sa","status":"publish","type":"post","link":"https:\/\/wgiem.com.ar\/en\/la-serenisima-sa\/","title":{"rendered":"LA SERENISIMA S.A."},"content":{"rendered":"<div id=\"pl-191\" class=\"panel-layout\">\n<div id=\"pg-191-0\" class=\"panel-grid panel-no-style\">\n<div id=\"pgc-191-0-0\" class=\"panel-grid-cell\" data-weight=\"1\">\n<div id=\"panel-191-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"0\" data-style=\"{&quot;background_image_attachment&quot;:false,&quot;background_display&quot;:&quot;tile&quot;,&quot;featured_widgets&quot;:&quot;&quot;,&quot;bigger_title&quot;:&quot;&quot;}\">\n<div class=\"so-widget-sow-editor so-widget-sow-editor-base\">\n<div class=\"siteorigin-widget-tinymce textwidget\">\n<div class=\"row col-md-12 custyle\">\n<table class=\"table table-striped custab\">\n<tbody>\n<tr>\n<td><strong>Empresa<\/strong><\/td>\n<td><strong>LA SERENISIMA S.A<\/strong>.<\/td>\n<\/tr>\n<tr>\n<td><strong>Dedicaci\u00f3n<\/strong><\/td>\n<td>Dairy Products Manufacturing<\/td>\n<\/tr>\n<tr>\n<td><strong>Direcci\u00f3n<\/strong><\/td>\n<td>Almte. Brown, B1748 Gral. Rodr\u00edguez, Provincia de Buenos Aires<\/td>\n<\/tr>\n<tr>\n<td><strong>Contacto<\/strong><\/td>\n<td>Ing. Enzo Prieto<\/td>\n<\/tr>\n<tr>\n<td><strong>Tel\u00e9fono<\/strong><\/td>\n<td>54 11 66737397<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h3>EXECUTION: Execution of the electrical system engineering for the General Rodriguez Plant. \/ August 2022 &#8211; October 2023.<\/h3>\n<h4 style=\"background: #e1e1e1; color: #006064; padding: 10px; font-weight: 400; letter-spacing: normal;\">Engineering Specification<\/h4>\n<ul>\n<li>Study and survey of the electrical system of the General Rodriguez industrial complex, from the supply point of EDENOR SA at 33 kV, down to the terminals of the low-voltage distribution boards (TGBT), which includes:<\/li>\n<li>2 Transformers of 20 MVA 33\/13.2 kV, step-down transformer station, main primary maneuver and distribution center at 13.2 kV; 2 secondary distribution centers at 13.2 kV.<\/li>\n<li>41 Internal distribution transformers, with their respective TGBTs, study of the center of gravity of electrical loads.<\/li>\n<li>Conceptual engineering for technological upgrading, organization, and technical project of the medium-voltage (MT) and low-voltage (BT) power system.<\/li>\n<li>Determination of the list of primary low-voltage loads.<\/li>\n<li>Determination of Icc (short-circuit current), in MT and BT.<\/li>\n<li>Design and projection of a new centralized internal distribution center.<\/li>\n<li>Design of a new 3.75 MVA CT 11<\/li>\n<li>Design of a new 6 MVA CT 12, from 13.2 kV to 3.3 kV for power motors.<\/li>\n<li>Design of a new 5 MVA CT 13.<\/li>\n<li>Calculation and design of an automatic power factor correction system. 9000 kVAr for the entire plant in BT.<\/li>\n<li>Calculation and design of an automatic power factor correction system. 1125 kVAr for the machine room in MT at 3.3 kV.<\/li>\n<li>Technological retrofit of the current distribution center.<\/li>\n<li>Creation of a model technical specification that regulates and determines technical specifications, performance standards, and quality for all MT and BT electrical installations.<\/li>\n<li>General technical specifications, tender documents.<\/li>\n<li>Generation of more than 480 technical documents.<\/li>\n<li>Over 1850 hours of engineering work.&#8221;<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Empresa LA SERENISIMA S.A. Dedicaci\u00f3n Dairy Products Manufacturing Direcci\u00f3n Almte. Brown, B1748 Gral. Rodr\u00edguez, Provincia de Buenos Aires Contacto Ing. Enzo Prieto Tel\u00e9fono 54 11 66737397 EXECUTION: Execution of the electrical system engineering for the General Rodriguez Plant. \/ August 2022 &#8211; October 2023. Engineering Specification Study and survey of the electrical system of the &hellip;<\/p>\n","protected":false},"author":1,"featured_media":1866,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"categories":[38],"tags":[],"class_list":["post-1855","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/posts\/1855"}],"collection":[{"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/comments?post=1855"}],"version-history":[{"count":3,"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/posts\/1855\/revisions"}],"predecessor-version":[{"id":1860,"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/posts\/1855\/revisions\/1860"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/media\/1866"}],"wp:attachment":[{"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/media?parent=1855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/categories?post=1855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wgiem.com.ar\/en\/wp-json\/wp\/v2\/tags?post=1855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}